03/16/2026
Remodel weekly update: Slow but steady, that’s the motto for the past week. My time was a bit limited between work, packing Sabrina, moving her Posh supplies into storage, and working on the bathroom. But progress was made! I think we will be able to put our toilet and urinal and very soon. We’re shooting for next weekend. I just need to finish up that wall behind the bathtub and then I’ll be able to do another clean (I’m a messy tiler), seal the slate again, and then grout. I just want to get to the point that we can get the toilet, urinal, and maybe sink back in the bathroom. After that, I’ll focus on the shower. I’ll just keep on moving when my body is willing and the time allows.